Add property wind turbine concept and update project gallery
This commit is contained in:
53
decisions/2026-09-24-v009-wind-turbine.md
Normal file
53
decisions/2026-09-24-v009-wind-turbine.md
Normal file
@@ -0,0 +1,53 @@
|
||||
# Version 009 — a wind turbine for the property
|
||||
|
||||
24 September 2026. Marcus asked to add his own wind turbine to the property,
|
||||
the associated Git project and the public project page.
|
||||
|
||||
## Design
|
||||
|
||||
Added a conventional three-blade horizontal-axis turbine on a freestanding,
|
||||
tapered galvanised mast, with an ivory rotor/nacelle, tail vane, foundation cap
|
||||
and indicative lockable isolation cabinet. The illustrative location is
|
||||
(-36, 40) m, beyond the northwestern edge of the homestead. The hub is 18 m above local
|
||||
concept terrain and the rotor is 6 m in diameter. These are visual study
|
||||
dimensions, not a selected product, rated output or engineered design.
|
||||
|
||||
Retain solar and energy storage. Keep the turbine out of the garden court,
|
||||
future pavilion footprints, food beds and basketball reserve. Its final
|
||||
position, tower height, foundations, access and electrical route must be
|
||||
reconsidered against the actual site. No setback or wind clearance is verified.
|
||||
|
||||
## Deliverables and version boundaries
|
||||
|
||||
- Public model: `blender/samford-solarpunk-wind-tour-v009.blend`, derived only
|
||||
from the distributable v007 model. Prior binaries remain unchanged.
|
||||
- Private model: `/home/marcus/projects-private/samford-valley-home-v009/`
|
||||
contains the turbine added to the licensed v008 Blender scene. Never copy
|
||||
that binary into public Git or the web root.
|
||||
- Matching detailed and lightweight viewport geometry; the original 31 tour
|
||||
chapters remain, with turbine chapter 32 added (2 min 40 sec total).
|
||||
- Updated concept plan, actual Blender overview render, website and context.
|
||||
- The Unreal projects and v007 film retain their previous contents. The turbine
|
||||
has not yet been imported into Unreal or added to the film.
|
||||
|
||||
## Before equipment selection
|
||||
|
||||
Measure the wind resource at a representative proposed hub height and assess
|
||||
terrain, tree/building turbulence and seasonal variation. Then compare a
|
||||
supplier's independently supported power curve and expected annual energy
|
||||
against the household load and solar/storage plan. No output or payback is
|
||||
assumed in this revision.
|
||||
|
||||
Obtain site-specific advice on council planning/building requirements, tower
|
||||
engineering and geotechnical conditions, noise and neighbours, vegetation and
|
||||
wildlife, maintenance access and electrical protection. The electrical designer
|
||||
must establish compatible turbine control, braking/dump-load arrangements where
|
||||
required, battery/inverter integration, isolation and earthing. If grid-connected,
|
||||
confirm the combined generation connection requirements with Energex.
|
||||
|
||||
References checked 24 September 2026:
|
||||
- [Australian Government Your Home — renewable energy](https://www.yourhome.gov.au/energy/renewable-energy)
|
||||
- [Energex — solar connections and other technologies](https://www.energex.com.au/our-services/connections/residential-and-commercial-connections/solar-connections-and-other-technologies)
|
||||
|
||||
The existing lack of survey, property boundary, site wind measurements and
|
||||
engineering remains explicit. The pending wall-integrated bed is unchanged.
|
||||